Projects

Mattamy High Park 336,000 sq. ft. - Low-rise condo’s

Considered to be the largest project of its type in Ontario with 336 units. LEVELROCK® 2500 was poured at 1” thick directly onto the LEVELROCK® Sound Mat to achieve desired fire and sound ratings.

The LEVELROCK® 2500 was durable enough to be installed before the drywall. Tradespeople could walk on the area within 2-3 hours of application, and within 24 hours they were working in these areas, speeding up construction time at Mattamy Homes’ High Park Condo Complex.

Request a quote today